One of my favorite things about home improvement is getting to work alongside my husband/ best-friend to accomplish something that looks good or functions properly (or both!). I don't think we're quite to the status of looks good because of those awful yellow-orange walls, but the floor alone looks good!
We're not nearly as "in the groove" with tile projects as we used to be since we hired out the tile in our home bathroom and haven't otherwise done any tiling since Noah was an infant. While figuring out our groove again, a somewhat surprising separation of roles occurred. Brian was the mudder, I was the cutter. What?! The female in the equation is the one operating power tools while the guy does the highly detailed mud and setting job? Yep, that's how we roll. Brian has a lot more experience with all types of mud and trowels and I can cut a straight line. He's also much more picky about the final look and wants to only be able to blame himself if something is slightly crooked or less than awesome.
Enough chatter, here's the progress and the floor.
Bathroom, tile in progress |
Hall with coat closet and main unit entry, tile in progress |
Fun stuff getting the piece cut to go around the radiator pipe. This is probably the truest tile color in my pictures. |
Trickiest cut imaginable. I made a template out of cardboard to make sure I could make it work. |
Success, it fits! |
Getting some grout in there, then wiping it off again. |
Finished product as you would see it from the entry door. Looking sharp! |
Finished product in the bathroom. |
That's going to look so good when the walls are light gray and the door is not dark green! |
Prep bathroom walls for paint (clean up wallpaper removal dings and poor initial install job)
Re-hang bifold door at bedroom closet
Prime and paint wood (paneling, trim, door?)
Prime and paint walls
Paint radiator shrouds
Paint ceilings (they've seen better days and a fresh coat of paint can make the rooms look so much fresher)
Tile shower surround
Install bathroom fixtures
Get carpet installed
Then comes the fun part of adding all the things that makes is pleasant to stay there - furniture and textiles. I think Phase 1 would have come together much faster had we included so many of the other things we did during that time - installing light fixtures throughout the place so we could see, cleaning, cleaning, and more cleaning, wall prep on the second bedroom, radiator clean-up on additional radiators, bringing in basic kitchenware and a dining table to make it more functional while we work, bringing in a mattress so we could sleep somewhat comfortably while we work, etc. There's only so much car space, shopping time, and tools available!
The current goal is to get it humming with Phase 1 finished by June 1st. Then you all are going to flock to the shore for vacations!
1 comment:
A great article, that really gives an insight into the tiling process. The visual progress aids really help here, and this would be an invaluable blog for those looking at tiling their own homes but maybe don't have the know how.
Great work. You are to be commended.
Post a Comment